Quantity Surveyor

Gulf Engineering Company

📍 Kuwait City, Kuwait 📅 Posted oct 28, 2026 🔎 Ref: #35178
💼 Full Time
💼 Job TypeFull Time
📍 LocationKuwait
🏙 CityKuwait City
📄 Experience3–5 years in Plumbing & Firefighting or HVAC quantity surveying (depending on opening)
📅 Posted DateOct 28, 2026
Advertisements

Quantity Surveyor Jobs at Gulf – Job Overview

Quantity Surveyor Jobs at Gulf Engineering Company in Kuwait City, Kuwait, cover HVAC and Plumbing & Firefighting specializations within MEP contracting and maintenance. Each specialization requires 3–5 years of relevant experience. Applicants must currently be in Kuwait and hold valid Kuwait residency. The employer gives preference to candidates who can join immediately. The guidance below explains normal measurement, cost and payment tasks for these roles. It does not add employer requirements.

Job description

The following workflow describes general quantity surveying practice in MEP contracting and maintenance. Work usually starts with drawings, specifications and the contract's pricing documents. First, the surveyor identifies the service boundaries and checks which document revisions apply. A pipe route alone does not show every item that affects its cost. For example, specifications may also call for insulation, supports, valves and testing. The surveyor therefore reads drawings alongside written requirements before building the measurement basis. If documents leave a boundary unclear, a technical query helps establish what to include. This early check reduces missing items and prevents two packages from charging for the same work.

When the scope is clear, the surveyor turns the agreed work into quantities that others can trace and check. The surveyor separates pipework by size and material rather than using one total length. Likewise, equipment counts need clear descriptions so unlike units do not share one rate. Measurement sheets link each figure to a drawing, location or calculation. When routes cross several areas, clear labels help reviewers follow the totals without measuring everything again. The surveyor also keeps the measurement rules consistent with the contract. Otherwise, different treatment of fittings or deductions can distort comparisons between the estimate and actual work.

Quantity Surveyor Jobs at Gulf – MEP Measurement and Pricing

Once quantities are clear, pricing tests what each part of the work may cost. A useful rate separates material, labour and other relevant cost elements. However, a supplier's low price may cover less than another supplier's offer. The surveyor compares specifications, quantities and exclusions before treating quotations as equal. Delivery charges or omitted accessories can change the comparison, so the price alone is not enough. Technical staff can resolve product differences, while purchasing staff can clarify commercial terms. The resulting cost build-up should show its assumptions and allow a reviewer to understand the recommended allowance.

Advertisements

A drawing revision can create uncertainty after teams have already agreed a price. For example, a revised firefighting layout might move a pipe route around another service. The surveyor first compares the old and new layouts to isolate the actual change. Then, the surveyor checks the instruction record and separates extra work from omitted work. Site measurements and dated records help show what happened and when. However, a changed quantity does not automatically establish a right to extra payment. The contract terms and approval route still matter. The surveyor gives the project lead a clear cost assessment and identifies any unresolved approval.

Quantity Surveyor Coordination and Project Closeout

During progress assessment, the surveyor compares claimed work with records of what the team completed. Physical progress, material delivery and payment eligibility are different questions. For instance, equipment on site may not qualify for the same payment as installed equipment. The contract determines how the surveyor treats each stage. Checks against earlier claims also help prevent duplicate amounts. If the records do not support a claimed quantity, the surveyor identifies the gap. The site team can then supply measurements or explain the difference. A clear assessment shows the accepted amount, disputed amount and reason for each adjustment.

A cost report connects measured work with the expected cost of completing the package. The surveyor compares committed purchases, assessed subcontract work and remaining quantities with the budget. Because unpaid changes can affect the forecast, the report should distinguish agreed values from estimates. Project managers then have a clearer basis for deciding which cost issues need attention. At closeout, the surveyor brings together final measurements, change records and previous payment assessments. Unresolved items need clear reasons and supporting records rather than unexplained balancing figures. This organised record helps the parties discuss the final account without losing the history behind each amount.

Typical Duties & Responsibilities (General Role Guidance)

  • Maintain a drawing register so each measurement record identifies the revision used for the calculation.
  • Prepare bills of quantities with clear item descriptions, units and totals for commercial review.
  • Separate contractor and subcontractor package boundaries to identify overlaps before teams agree their respective values.
  • Track material wastage allowances separately from measured installation quantities so reviewers can test the pricing assumptions.
  • Record daywork labour, materials and equipment against signed records when the contract uses this payment basis.
  • Check subcontractor account deductions against agreed terms and show each deduction clearly in the assessment.
  • Maintain a list of pending commercial queries with responsible contacts and dates for follow-up.
  • Reconcile purchase quantity changes against the original allowance to identify possible cost pressure before final settlement.

Candidate Profile

A suitable quantity surveyor should be able to read the drawings for the service package they work on and check quantities against the latest plans and specifications. Careful measurement matters because an incorrect figure can affect a quotation, purchase order, payment assessment or project budget. The role also calls for clear records so other team members can understand how a quantity or cost was calculated. On MEP projects, quantity surveyors often work with engineers, purchasing teams and project managers to check the scope of work and explain cost changes. For HVAC work, applicants can prepare examples involving ducts, pipes, equipment and related installation quantities. For Plumbing & Firefighting work, useful examples may involve pipe sizes, valves, fittings, pumps and similar building services. These are examples of normal occupational work, not extra employer-stated conditions.

Candidates can strengthen their application by explaining a real measurement, quotation comparison or cost check they completed. Describe the documents used, the problem found and how they handled it. Do not share confidential drawings, customer names or figures without permission. Most importantly, apply for the specialization that matches your own experience. Clear emails and neat spreadsheets help engineers and managers review quantities without confusion. Before applying, confirm the job scope and joining arrangements directly with the employer. For official information on working in Kuwait, see the Kuwait Public Authority for Manpower. To compare other openings, visit our current job listings.

Qualifications & Requirements

  • Plumbing & Firefighting 3–5 years of experience (Quantity Surveyor specialization).
  • Currently available in Kuwait
  • Valid Kuwait Residency.
  • Relevant experience in the respective position (HVAC or Plumbing & Firefighting).
  • Immediate joiners will be given preference
  • 3–5 years of HVAC experience. This is the Quantity Surveyor — HVAC specialization.

Useful Skills & Competencies

  • Drawing interpretation: Understand service symbols, sizes and connections well enough to recognise the scope behind a quantity.
  • Numerical reasoning: Work confidently with units, percentages and rate calculations while spotting results that need another check.
  • Spreadsheet literacy: Use structured tables and clear formulas to make calculations easier to inspect and update.
  • Commercial judgement: Distinguish a measured change from a contractual entitlement before drawing conclusions about payment.
  • Technical reading: Compare specifications and product descriptions without treating different materials or performance levels as equivalent.
  • Written explanation: Present a cost difference in plain language so technical and commercial colleagues understand its basis.

About Gulf Engineering Company

Gulf Engineering Company is a member of Boodai Corporation and works in electro-mechanical services, contracting and maintenance. The company was established to meet demand in Kuwait for air-conditioning, firefighting, plumbing, electrical and building management systems.

How to Apply

Interested candidates are requested to send their updated CV to: hrjobs@gulfengg.com. The recruitment notice identifies this email as the application contact.

Candidate Requirements

💼 Experience3–5 years in Plumbing & Firefighting or HVAC quantity surveying (depending on opening)
📨
Interested in this job?Apply now and submit your profile for this opportunity.
✈ Apply by Email

Similar Jobs You May Be Interested In

View all jobs
Apply safely for Quantity Surveyor Do not pay for an application, interview or job offer. Verify unusual requests before sharing sensitive personal or financial information.
Contact Support
Advertisements