Quantity Surveyor

New

AFAQ Engineering for Building Contracting LLC

📍 Dubai, UAE 📅 Posted today 🔎 Ref: #34901
💼 Full Time
💼 Job TypeFull Time
📍 LocationUAE
🏙 CityDubai
📄 Experience5 Years. Minimum 5 years of UAE high-rise building experience in the relevant role is mandatory for all positions.
📅 Posted DateToday

Dubai Quantity Surveyor Jobs – Job Overview

For applicants exploring Dubai Quantity Surveyor Jobs, AFAQ Engineering for Building Contracting LLC lists a Quantity Surveyor vacancy in Dubai, UAE, within construction. The notice identifies UAE high-rise building experience as central to eligibility. It also gives the address Office No. 104, Mohammed Saeed Hareb Building, Port Saeed, Dubai. The role sits within quantity surveying, a discipline concerned with construction measurement, valuation and cost control.

Job description

In general quantity surveying practice, preparation starts with identifying which drawings, specifications and commercial documents govern the work under assessment. A surveyor checks revision numbers and separates current information from superseded documents before measuring any building element. For high-rise construction, floor plans, structural details and schedules may describe repeated elements alongside changes at podium, transfer or roof levels. The surveyor establishes what the package includes, which measurement rules apply and where design information remains incomplete. These are general occupational workflows, rather than duties or procedures specified by AFAQ Engineering for Building Contracting LLC.

Measurement turns design information into traceable quantities that another commercial reviewer can reproduce. Rather than treating every tower floor as identical, a quantity surveyor groups genuinely repeated layouts and measures exceptions separately. For concrete work, this can involve distinguishing slab volume, formwork contact area and reinforcement quantities, each with its own measurement basis. Clear dimension references and stated deductions help prevent duplicate allowances at openings or interfaces between packages. The output should show the calculation route, not simply a final total, so design revisions can later be evaluated without rebuilding the entire assessment.

Checks and exception handling

Pricing then connects those quantities to the commercial scope, rather than assuming that the lowest quoted rate represents the lowest cost. A surveyor examines whether an offered rate includes the same materials, labour, plant and access provisions as the estimate or comparison. Exclusions, provisional allowances and different units can otherwise make two prices appear comparable when they cover different work. Once the scope aligns, the surveyor explains the basis of any adjustment and separates firm pricing from unresolved assumptions. This gives the commercial decision-maker a defensible comparison while keeping uncertainty visible instead of concealing it inside an overall figure.

A typical high-rise valuation issue arises when a subcontractor claims a full floor slab quantity although an identified pour remains incomplete. The quantity surveyor first compares the claim with the measurement breakdown, reporting cut-off and available site records. Site personnel can confirm the physical extent of completed work; the applicable contract determines its valuation treatment. The surveyor separates the substantiated amount from the disputed balance and records the reason for any proposed adjustment. The subcontractor and commercial lead need the same clear explanation, with supporting references, before the assessment moves forward. This illustration concerns evidence and valuation, not an assumed payment policy at the advertised employer.

Coordination and completion

Change assessment follows a different evidence trail because a revised quantity alone does not establish contractual entitlement. A surveyor links the original scope, the instruction or other relevant event, the resulting measurement difference and the proposed valuation basis. Where design development affects several trades, the assessment distinguishes direct quantities from overlapping allowances so the same effect does not enter multiple submissions. The person authorised to administer the contract decides matters outside the surveyor's remit, using the assembled evidence. An effective handover identifies what is agreed, what still needs clarification and which response would allow the commercial assessment to progress.

Periodic cost review brings measured work, commitments and remaining scope together to explain the likely financial outcome. A quantity surveyor distinguishes amounts already incurred from forecast expenditure and avoids treating every unresolved claim as an approved cost. Movement between reporting periods needs an identifiable cause, such as a measured scope change or a revised estimate for unfinished work. At completion, reconciliation checks that previous payments, agreed adjustments and outstanding balances align with the supporting account records. During any site verification, the surveyor follows site access and safety controls rather than entering restricted areas to obtain measurements. The final commercial record should let another reviewer understand both the figures and their limitations.

Dubai Quantity Surveyor Jobs – Typical Duties & Responsibilities

  • Maintain a query register that assigns each missing commercial input an owner and tracks whether a usable response arrives.
  • Prepare tender clarifications that define package boundaries and expose omitted work before commercial comparisons inform procurement decisions.
  • Review material reconciliation statements against recorded deliveries and usage to identify unexplained differences requiring investigation.
  • Assess proposed alternative specifications on a like-for-like cost basis, keeping technical acceptance separate from potential savings.
  • Track contractual notice dates and supporting correspondence so the responsible contract administrator can act within applicable time limits.
  • Prepare cash flow projections that distinguish anticipated work value from expected payment timing and clearly state their assumptions.
  • Check retention and advance recovery calculations against the relevant contractual provisions before including them in a commercial assessment.
  • Organise final account attachments so reviewers can locate agreed amounts, unresolved items and the correspondence supporting each position.

Candidate Profile

Applicants can prepare an anonymised example of a procurement comparison they personally developed, showing how they identified an exclusion and explained its cost impact. Describe your own contribution, the evidence available and the decision that followed, without disclosing a former employer's confidential rates. Project summaries can identify UAE high-rise work and the quantity surveying tasks you actually handled. Useful questions for the employer include which construction packages the role covers, who reviews commercial submissions and how office work and site visits are divided.

Qualifications & Requirements

  • Minimum 5 years of UAE high-rise building experience in the relevant role is mandatory for all positions.
  • Candidates currently based in the UAE are encouraged to apply.

Useful Skills & Competencies

  • Drawing interpretation: Understand how plans, sections and schedules describe building elements, including interfaces that affect measurement.
  • Numerical reasoning: Recognise unit inconsistencies, implausible totals and rounding effects before they distort a commercial conclusion.
  • Contract literacy: Distinguish scope, entitlement and valuation questions without treating one as proof of the others.
  • Commercial writing: Explain a financial position in concise language that connects an amount to its supporting evidence.
  • Data organisation: Structure calculations and document references so another person can trace assumptions and test the result.
  • Professional judgement: Recognise when evidence supports an assessment and when uncertainty warrants referral to an authorised decision-maker.

How to Apply

Send your application to zia@afaqengineering.com.

Browse more vacancies · Company information

Candidate Requirements

💼 Experience5 Years. Minimum 5 years of UAE high-rise building experience in the relevant role is mandatory for all positions.
📨
Interested in this job?Apply now and submit your profile for this opportunity.
✈ Apply by Email

Similar Jobs You May Be Interested In

View all jobs
Apply safely for Quantity Surveyor Do not pay for an application, interview or job offer. Verify unusual requests before sharing sensitive personal or financial information.
Contact Support